Commissioning
There are wishes. There are requirements. There are designs. There is engineering. And then there is making sure each piece of equipment, each step and each process, as well as the overall production scheme, works as described and designed.
This is commissioning.
Completed before handing the process over for the verification phase of validation, commissioning usually take months. With thousands of I/O points to check, millions of dollars of equipment to install and test and complex sequences to for which establish within specification performance, it can feel like years.
Equipment can be delivered behind schedule. Parts or functionality can be missing. Wiring can be misrouted. Code can need changes. Tweaks and adjustments are standard.
As your controls and automation partner—and company that has implemented more than 2,500 automation projects during the last decade—we help you work through the issues and get your processes, systems and facilities validatable as expeditiously as possible. That includes finalizing validation documents to reflect any adjustments.
Some analyze. Some plan. Some design. Some engineer. Some implement. Some support. We do them. We’ve always believed that living through the lifecycle with what you engineer and install makes you a better provider. Such beginning-to-end-to-renewal insight (we’ve worked with many of our clients long enough to assist them with upgrading or replacing our previous work) is valuable during commissioning
RoviSys commissioning serves include:
- Validatable control system implementation, including complex batch integration
- High level process modeling simulation to low level I/O modeling simulation
- Factory acceptance test
- Site acceptance test
- Loop checks
- Equipment
- Customer software acceptance test