Legacy control system extension, migration and replacement experience
RoviSys has extensive experience in ABB Bailey legacy distributed
control systems. A number of RoviSys employees were previously employed at
Bailey Controls, some directly involved in the
design and development of flagship legacy distributed controls, consoles and software
tools. Others served as system engineers and have extensive
experience in the implementation of Network 90 and Infi 90 systems.
RoviSys also has extensive experience in the replacement of the legacy distributed control system with a number of contemporary solutions. In addition to those listed here, previous projects include migrations from legacy systems to PLC5, L&N Max1 to PLC5, CRISP to PLC5, Bailey Infi90 to Emerson DeltaV, single loop controllers to PLC5 and pneumatic controls to distributed control system and PLC.
As an independent company, we are technology neutral: We recommend the solution that works best for you, not for us or any vendor. These solutions are open, documented and supportable. Whatever your legacy system extension or migration goal, if you want a conversions partner who has deep experienced in legacy and modern controls, is committed to providing open and supportable solutions and is independent and resourceful, consider RoviSys.
Legacy control system sample case histories
| Infi90 console migration to modern HMI | |
| Application |
Midwestern steel maker |
| Legacy controls |
Bailey Infi90 redundant distributed control system |
| New controls |
Redundant
Rockwell RSView SE servers |
| Implementation |
Phased migration using RoviSys
OPC 90 Server interface to
existing Infi90 distributed control
system with redundant
Plant Loop |
| New capability |
Client able to support additional screens and tags (limited legacy ability) |
| Infi90 with Conductor NT complete replacement | |
| Application |
Powerhouse controls for Midwestern steel maker running four fuels on each of three boilers |
| Legacy controls |
Bailey Infi90 distributed control system and consoles |
| New controls |
Complete replacement with Rockwell ControlLogix and RSView SE HMI |
| Implementation |
Function
block programming replaced
Bailey N90 configuration
plus ladder
enhancement |
| New capability |
Fast control reaction, avoiding past trouble during wide load swing |
| PROVOX migration to DeltaV | |
| Application |
$2 million migration for life sciences plant |
| Legacy controls |
4,000 I/O-point Fisher PROVOX system |
| New controls |
Emerson DeltaV distributed control system |
| Implementation |
Multi-phased approach to minimize production downtime |
| New capability |
Project in progress |
| Honeywell TDC logic and HMI extension | |
| Application |
Hazardous waste incineration |
| Legacy controls |
Honeywell TDC3000 distributed control system |
| New controls |
Added Rockwell ControlLogix and RSView SE |
| Implementation |
ProcessLinx between RoviSys
OPC 90 Server and Honeywell OPC Servers |
| New capability |
New RSView screens
motivated operations to ask for expansion of
RSView |
| Modcell to ControlLogix | |
| Application |
Epoxy reactor control system |
| Legacy controls |
Modcell controllers and dedicated HMI |
| New controls |
Rockwell ControlLogix and RSView SE PC HMI |
| Implementation |
Three-day cutover on holiday weekend |
| New capability | |
| Rosemont to ControlLogix | |
| Application |
Multi-tank and -mixer blending operation |
| Legacy controls |
Rosemont RS3 |
| New controls |
Rockwell ControlLogix |
| Implementation |
Rip and replace in one week from demolition to full production |
| New capability |
Now
run in full auto mode |
| PROVOX to ControlLogix | |
| Application |
Resin reactor and ancillary equipment |
| Legacy controls |
PROVOX with CHiP interface to subsystems |
| New controls |
Redundant Rockwell ControlLogix with OPC and serial interfaces |
| Implementation |
Cutover in less than one week, including demolition and installation |
| New capability |
Batch custom recipe builder to meet customer requirements |